Pine Valley 15 ML Reservoir and Chemical Dosing Facility

PROJECT DESCRIPTION

15ML Pine Valley Reservoir

Reservoir Design and Construction Works for the Pine Valley WSP Project.

The scope includes

  • Detailed design and construction of a 15ML reservoir, (44m diameter with 11m high panels)
  • earthworks,
  • Construction of a new chemical dosing dosing facility
  • installation of the OD560 PE inlet and OD800 PE outlet pipework
  • supply Installation of the DN750 inlet and DN750 outlet pipework within the reservoir area
  • supply and installation of all stormwater drainage across the reservoir site
  • Supply and installation of the Inlet and Outlet Control valves and flow meters
  • supply and Installation of all Conduits and Pits within the reservoir site
  • testing and commissioning of the new reservoir and pipe work

PROJECT DETAILS

Client Downer
Project Location Jacko Place Narangba
Constract System Design and Construct
Contract Sum $16.0 Million
Completon Date Feb 27